Fees
New Construction
Also, see below for applicable Park Fund Fees
- 1 and 2 residential family homes: $0.15 per square feet of building area plus $390 (includes plumbing, electrical and HVAC); required State of Wisconsin permit seal: Actual Cost; and Residential Building Permit Administration Fee: $25
- Early Start Permit: $100 (credited towards building permit fees)
- Detached garages 167 Sq. Ft. and larger: $0.15 per square foot
- Apartment buildings: $0.15 per square foot plus Commercial Administration Fee
- Warehouse, storage building, commercial and industrial buildings: $0.15 per square foot per level and Commercial Administration Fee
- Commercial Construction Permit Administration Fee: $50
- Erosion Control Permit: $100
Alterations, Repairs, Demolition or Moving Structures
- Where square footage cannot be calculated or is not feasible: $10 for each $1,000 of cost for first $100,000 then $1 per $1000 thereafter
* Minimum permit fee $40
For all other commercial buildings where square footage can be calculated:- $0.15 per square foot per level
- Erosion Control Permit for building additions that involve excavations: $100
- Addition on slab or crawlspace: $10 for each $1,000 of cost
- Addition on basement below: $10 for each $1,000 of cost
Specific Fees
- Siding permit: $40
- Roofing and Reroofing - per Residential dwelling or garage: $40
- Roofing and Reroofing - per Commercial building: $10 for each $1,000 of cost
- Windows and Doors (replacement of like-kind): $20 (1-5); $40 (6+)
- Any detached shed or garage up to 166 sq. ft: $40
- Decks and porches: $0.10 per square foot and a minimum fee of $40
- Demolition fee: Same as alterations as set forth above with a minimum fee of $40
- Moving fee: Same as alterations as set forth above with a minimum fee of $40
- Foundations for moved buildings: $10 for each $1,000 of cost
Fences
- Fences over 24 inches height and 20 feet length: $40
Swimming Pools
- All above or below ground swimming pools, either temporary or permanent, in which water of more than 24 inches in depth is contained and is used primarily for swimming or water recreation: $40
- Minimum fee for any building permit: $40
Park Fund Fees
- New single family construction: $300 per new unit
- New multi-family building construction: $300/first unit and $275/second unit
- New commercial buildings and additions: Up to 25,000 cubic feet $300; more than 25,000 cubic feet $300 plus $2 per additional 1,000 cubic feet or portion thereof over 25,000 cubic feet
Plumbing Permit Fees
- Fees can be found under "Plumbing" or contact the Building Inspector for current fees at 715-526-6138.
Electrical Permit Fees
- Fees can be found under "Electrical" or contact the Building Inspector for current fees at 715-526-6138.
HVAC Permit Fees
- Fees can be found under "Heating, Ventilating & Air Conditioning (HVAC)" or contact the Building Inspector for current fees at 715-526-6138.
Click the image above and use PLC #7191 to pay your permit fees online.
Contact Us
-
Community Development
Planning & Zoning
Building Inspection
Code Enforcement
127 S Sawyer Street
Shawano, WI 54166Phone: 715-526-6138
Fax: 715-526-5751Dave Moesch
Planning & Zoning Administrator
EmailPaul Hahn
Building Inspector
EmailDena Henning
Code Enforcement/Administrative Assistant
EmailOffice Hours
Monday - Thursday
7:00 am - 4:30 pm
(except specific holidays)Friday
7:00 am - 11:00 am
(except specific holidays)Typical Building Inspection Hours
Monday, Wednesday & Friday
10:00 AM - 12:00 PM
(except specific holidays)